GBAPP Port Code Lookup
Total 1 ports of GBAPP
Appledore Port is the seaport of Appledore, in the city of Appledorein United kingdom. Overseas routes include Europe, Port code is GBAPP.
Port Overview
Appledore Port (GBAPP), United Kingdom
Appledore is a small estuarine port in North Devon, positioned at the mouth of the Torridge and Taw rivers where they enter the Bristol Channel. Its operating profile is principally associated with fishing, leisure craft and maritime industry rather than scheduled container shipping. The remaining shipyard is a major local maritime facility, while the river continues to support fishing and recreational activity. The supplied port record identifies the longest vessel reported to have entered the port as 90 metres; this should not be treated as a current acceptance limit. Our service team therefore treats GBAPP as a specialist or project-call location and confirms berth, tide, draft, vessel suitability and cargo-handling arrangements before planning an ocean shipment.
| UN/LOCODE | GBAPP |
|---|---|
| Location | Appledore, North Devon, United Kingdom |
| Coordinates | 51.0487309, -4.1911619 |
| Port profile | Estuarine maritime port; fishing, leisure and shipyard-oriented activity |
| Recorded vessel reference | Maximum reported vessel length: 90 m, subject to operational confirmation |
Key Highlights
- Not a conventional container gateway: regular FCL/LCL availability should never be assumed from the GBAPP code alone.
- Estuary-dependent operations: tide, weather, river conditions and vessel manoeuvrability can affect the practical call window.
- Specialist maritime role: fishing, leisure craft, shipyard and project-related movements are more relevant than high-volume liner cargo.
- Regional gateway planning: containerised cargo may need routing through a suitable commercial port, followed by road delivery to North Devon.
- Advance confirmation is essential: berth, cargo equipment, storage, customs handling and inland access must be checked case by case.
Facilities & Services
Facility Assessment for Freight Planning
- Marine access: river-estuary access for suitable vessels, subject to tide, navigation conditions, local restrictions and harbour confirmation.
- Shipyard capability: the local shipyard is a key maritime asset, but shipbuilding or repair capability should not be interpreted as general-purpose cargo-terminal capacity.
- Container handling: no regular container terminal, quay crane, reefer plug or empty-container service should be presumed for GBAPP; our team verifies equipment before accepting the routing.
- Breakbulk and project cargo: possible only where the nominated facility confirms lifting equipment, working area, safe access and cargo dimensions.
- Storage and inspection: covered storage, open laydown, customs examination and temporary holding arrangements require case-specific confirmation rather than code-based assumptions.
- Inland connectivity: road collection and delivery are the practical planning basis; vehicle type, bridge limits, rural access and delivery appointment requirements must be checked.
Routes & Transit Times
Routing and Schedule Considerations
- For containerised imports and exports, our service team normally evaluates a suitable commercial container gateway in Southwest or wider United Kingdom networks, then arranges road transport to or from North Devon. The final port depends on carrier acceptance, equipment and cargo requirements.
- For vessel-specific, shipyard or project movements, a direct call may be considered only after confirming vessel dimensions, draft, tide window, pilotage or local marine requirements, berth availability and cargo-handling resources.
- Transit time is affected by transshipment or feeder connections, UK customs processing, road mileage, rural delivery constraints, weather and the availability of a tidal operating window.
- We do not promise a direct service, fixed sailing frequency or guaranteed transit time for GBAPP. The booking quotation should state the confirmed port, cut-off, routing and delivery point.
Hinterland & Key Cargo
Regional Demand Profile
- Primary hinterland: Appledore and the wider North Devon area, with road distribution serving local maritime, engineering, construction, tourism and general commercial demand.
- Maritime cargo: fishing-related supplies, marine equipment, vessel stores, repair materials and shipyard inputs may be relevant, subject to facility acceptance.
- Project and industrial cargo: machinery, fabricated components and out-of-gauge pieces require route surveys, lifting plans and confirmation of temporary storage.
- General cargo: palletised or containerised goods are more likely to move through a regional commercial container port and continue by road than to be handled as a routine GBAPP liner shipment.
Operations & Compliance
Control Points for Forwarders
- Booking and cut-off: GBAPP must not be entered as the operational load port without confirmation from the nominated terminal, vessel operator or harbour contact. Cut-off, gate-in and documentation deadlines are shipment-specific.
- Dangerous goods: provide the correct UN number, proper shipping name, class, packing group, quantity, packaging and emergency information before booking. Acceptance depends on the actual facility and vessel.
- Customs: confirm the appropriate UK import, export, transit or temporary-admission procedure and ensure the declaration references the actual place of presentation or approved facility. Customs requirements should be checked against current guidance on gov.uk.
- Inland delivery: obtain cargo dimensions, gross weight, lifting points and delivery address early. Oversize cargo may require a route survey, abnormal-load planning, police or road-authority coordination and a confirmed unloading method.
Shipping Tips
Recommended Shipment Strategy
- Send our service team the commodity, packing type, dimensions, weight, stackability, dangerous-goods status, delivery postcode and desired date before requesting a GBAPP routing.
- For standard containers, compare a confirmed regional gateway plus road delivery with any specialist coastal call. The comparison should include handling, demurrage exposure, road distance and customs location.
- For project cargo, prepare a dimensional drawing, lifting points, centre of gravity, packaging details and unloading plan; request written confirmation of berth, equipment and safe working limits.
- Keep a contingency plan for tidal or weather disruption, including an alternative commercial port, temporary storage and revised final-mile transport. All operational windows remain subject to confirmation.
Frequently Asked Questions
GBAPP Freight Handling FAQs
Can I book a normal FCL shipment directly to GBAPP?
Do not assume this is possible. GBAPP is not presented as a routine container gateway in the supplied port profile. Our team will check carrier, terminal, equipment and road alternatives before quoting.
Is the 90-metre vessel figure a guaranteed acceptance limit?
No. It is the longest vessel reported in the supplied record. Actual acceptance depends on vessel length, beam, draft, manoeuvrability, tide, berth, weather and current harbour instructions.
What is the best option for standard container cargo?
Our service team generally assesses a suitable commercial container port with onward road transport to North Devon. The selected gateway must be confirmed against the carrier booking and cargo characteristics.
Can dangerous goods or oversized cargo be delivered to Appledore?
Potentially, but only after facility, vessel, road and regulatory approval. Submit the full DG declaration or project-cargo data before booking; acceptance is not inferred from the UN/LOCODE.
Which details should appear on the quotation?
The quote should identify the confirmed port or terminal, cargo-handling basis, inland leg, customs location, cut-off assumptions, exclusions, tide or weather dependencies and any alternative routing.
Data Sources & Provenance
Reference Scope and Verification Boundary
The port code, name, country, city, coordinates, port description and 90-metre reported vessel-length reference are taken from the supplied GBAPP port master data. Operational interpretations are limited to the stated estuarine, fishing, leisure and shipyard profile. No unsupported berth, draft, throughput, equipment, sailing frequency, tariff or guaranteed transit-time figures are presented.
- UK government customs and border guidance: gov.uk
- Local North Devon authority information relevant to local harbour and transport context: torridge.gov.uk
Source boundaries: port access, berth availability, tide windows, vessel acceptance, cargo handling, customs presentation points and inland restrictions must be reconfirmed with the nominated operator and relevant authorities before shipment execution.